CSVed 2.2.3 freeware
CSVed is an powerful and easy to use CSV file editor, you can use it to manipulate any CSV file, separated with any separator.
CSVed comes instead of CSVdb, the main difference is how csv files are handled, for more details compare both help files on chapter CSV file format. ...
Author | Sam Francke |
Released | 2012-07-25 |
Filesize | 1.70 MB |
Downloads | 747 |
OS | Windows XP, Windows Vista, Windows 7 |
Installation | Instal And Uninstall |
Keywords | file editor, CSV editor, remove duplicate, split, editor, CSV |
Users' rating (21 rating) |
CSVed Free Download - we do not host any CSVed torrent files or links of CSVed on rapidshare.com, depositfiles.com, megaupload.com etc. All CSVed download links are direct CSVed download from publisher site or their selected mirrors.
2.2.3 | Jul 25, 2012 | New Release | · some spinedit components ExtendedAccept enabled · label nummer deleted · filter global exact enabled again |
2.2.2 | May 23, 2012 | New Release | · added: auto save file · added: change thousands and decimal separators · added: truncate data in save as fixed file · added: hide and unhide columns in list view · added: input Other sep limited to one char |
2.2.1 | Nov 30, 2011 | New Release | · added: split TAB Colum Edit in two TABs; · added: remove white space; · added: in create new file add empty rows; · added: split current file in two or more small files; · added: remove obsolete items in MRU at startup. |