CSVFileView 2.64 freeware
... one of the fields, remove unwanted fields and change their order, and then save the result back into CSV file, tab-delimited file, XML file, or HTML report. ...
Author | NirSoft |
Released | 2023-05-13 |
Filesize | 164 kB |
Downloads | 2363 |
OS | Windows XP, Windows Vista, Windows Vista x64, Windows 7, Windows 7 x64, Windows 8, Windows 8 x64, Windows 10, Windows 10 x64, Windows 11 |
Installation | Instal And Uninstall |
Keywords | CSV Viewer, Edit CSV, View CSV, Viewer, Editor, Preview |
Users' rating (19 rating) |
CSVFileView Free Download - we do not host any CSVFileView torrent files or links of CSVFileView on rapidshare.com, depositfiles.com, megaupload.com etc. All CSVFileView download links are direct CSVFileView download from publisher site or their selected mirrors.
2.64 | May 13, 2023 | New Release | Fixed issue: When copying data to the clipboard or exporting to tab-delimited file, every line contained an empty field in the end of the line. |
2.63 | Feb 21, 2023 | New Release | |
2.62 | Dec 5, 2022 | New Release |