Portable CSVed 2.2.3 freeware
CSVed is an powerful and easy to use CSV file editor, you can use it to manipulate any CSV file, separated with any separator.
CSVed comes instead of CSVdb, the main difference is how csv files are handled, for more details compare both help files on chapter CSV file format. ...
Author | Sam Francke |
Released | 2012-07-25 |
Filesize | 1.40 MB |
Downloads | 567 |
OS | Windows XP, Windows Vista, Windows 7 |
Installation | Instal And Uninstall |
Keywords | file editor, CSV editor, remove duplicate, split, editor, CSV |
Users' rating (15 rating) |
Portable CSVed Free Download - we do not host any Portable CSVed torrent files or links of Portable CSVed on rapidshare.com, depositfiles.com, megaupload.com etc. All Portable CSVed download links are direct Portable CSVed download from publisher site or their selected mirrors.
2.2.3 | Jul 25, 2012 | New Release | · some spinedit components ExtendedAccept enabled · label nummer deleted · filter global exact enabled again |
2.2.2a | May 30, 2012 | New Release | · fixed: save file Refresh |
2.2.1 | Nov 30, 2011 | New Release |