Wireshark (x64bit) 4.4.8 freeware
Wireshark, developed by Gerald Combs, is a powerful and widely-used network protocol analyzer that empowers users to capture and interactively browse network traffic in real-time. Its intuitive interface and robust features make it an essential tool for network administrators, security professionals, and developers. With support for hundreds of protocols and extensive filtering options, Wireshark enables detailed analysis of network performance and security issues. Whether troubleshooting or lea ... ...
Author | Gerald Combs |
Released | 2025-07-17 |
Filesize | 82.30 MB |
Downloads | 3660 |
OS | Windows Server 2025, Windows 11, Windows Server 2022, Windows Server 2019, Windows Server 2016, Windows 10 32/64 bit, Windows 8 32/64 bit |
Installation | Instal And Uninstall |
Keywords | Wireshark, network diagnostic, protocol analyzer, network monitor, protocol, analyzer, diagnostics, analysis |
Users' rating (54 rating) |
Wireshark (x64bit) Free Download - we do not host any Wireshark (x64bit) torrent files or links of Wireshark (x64bit) on rapidshare.com, depositfiles.com, megaupload.com etc. All Wireshark (x64bit) download links are direct Wireshark (x64bit) download from publisher site or their selected mirrors.
4.4.8 | Jul 17, 2025 | New Release | Bug Fixes: The following bugs have been fixed: Renegotiated DTLS session is not being decrypted. Issue 20362. Wireshark is completely stuck in initialization because androiddump recv() is blocked. Issue 20526. Fuzz job UTF-8 encoding issue: fuzz-2025-06-20-7318.pcap. Issue 20585. Crash when showing packet in new window after reloading Lua plugins with a certain gui.column.format preference. Issue 20588. Bug in UDS dissector with Service ReadDataByPeriodicIdentifier Response. Issue 20589. Packet diagram doesn’t show non-standard field value representations. Issue 20590. Packet diagram shows representation twice when field type is FT_NONE. Issue 20601. application/x-www-form-urlencoded key parsed incorrectly following a name-value byte sequence with no '=' Issue 20615. DNP3 time stamp was unable to work after epoch time(year 2038) Issue 20618. Updated Protocol Support: ASTERIX, DLT, DNP 3.0, DOF, DTLS, ETSI CAT, Gryphon, IPsec, ISObus VT, KRB5, MBIM, RTCP, SLL, STCSIG, TETRA, UDS, and URL Encoded Form Data New and Updated Capture File Support: pcapng |
4.4.0 | Aug 28, 2024 | New Release | The following bugs have been fixed: RADIUS dissector’s dictionary loading broken in many ways. Issue 6466. 3.4 |
4.2.6 | Aug 1, 2024 | New Release | The following bugs have been fixed: RADIUS dissector’s dictionary loading broken in many ways. Issue 6466. 3.4 |