JACo Watermark 0.4.0 freeware
... and apply a watermark to your pictures in order to protect them from unauthorized distribution. Different font, color, size and transparency texts or images can be added as a watermark. Batch processing is also provided. ...
Author | Cristian Sulea |
Released | 2014-06-20 |
Filesize | 287 kB |
Downloads | 611 |
OS | Windows XP, Windows Vista, Windows 7 |
Installation | Instal And Uninstall |
Keywords | apply watermark, watermark adder, protect image, watermark, protection, protect |
Users' rating (12 rating) |
|
Our rating |
![]() |
JACo Watermark Free Download - we do not host any JACo Watermark torrent files or links of JACo Watermark on rapidshare.com, depositfiles.com, megaupload.com etc. All JACo Watermark download links are direct JACo Watermark download from publisher site or their selected mirrors.
0.4.0 | Jun 20, 2014 | New Release | On start, the application will restore the last used settings. The preview is for the entire image, with scroll bars to change the visible area in case the image is bigger than the view. When the watermark changes, the tool will auto scroll trying to make visible (center if possible) the area with the watermark. Brand new theme for the user interface. |
0.2.0 | Jul 4, 2011 | New Release | * Added the option to select the save format (JPG, PNG). * Added the option to select the compression level for JPG format. |