Jubler for Mac OS X 7.0.3 freeware
Jubler is a tool to edit text-based subtitles. It can be used as an authoring software for new subtitles or as a tool to convert, transform, correct and refine existing subtitles. Furthermore, this application supports all the most popular subtitle formats. ...
Author | Panayotis Katsaloulis |
Released | 2020-05-31 |
Filesize | 30.70 MB |
Downloads | 1166 |
OS | Mac OS X |
Installation | Instal And Uninstall |
Keywords | subtitle editor, edit subtitle, correct subtitle, subtitle, sync, spellcheck |
Users' rating (41 rating) |
|
Our rating |
![]() |
Jubler for Mac OS X Free Download - we do not host any Jubler for Mac OS X torrent files or links of Jubler for Mac OS X on rapidshare.com, depositfiles.com, megaupload.com etc. All Jubler for Mac OS X download links are direct Jubler for Mac OS X download from publisher site or their selected mirrors.
7.0.3 | May 31, 2020 | New Release | |
7.0.0 | May 10, 2020 | New Release | Various launcher fixes and updates. Improved keyboard navigation. |
7.0.0 Alpha | Nov 4, 2019 | New Release | Embed JRE. Update icon. Timeline updates. |