- Freeware
- - Graphic Apps
- - CAD
- - SeiSee
SeiSee 2.22.6 freeware
... content of CWP, CGG and CST files in order to examine the data.You can use the program to open the single shot files and to view the headers and the seismic data. The file processing can be adjusted by changing the gain control and the filter spectrum. ...
Author | Sergey I. Pavlukhin |
Released | 2015-04-17 |
Filesize | 6.30 MB |
Downloads | 809 |
OS | Windows XP, Windows Vista, Windows Vista x64, Windows 7, Windows 7 x64, Windows 8, Windows 8 x64, Windows 10, Windows 10 x64 |
Installation | Instal And Uninstall |
Keywords | seismic data viewer, analyze earthquake data, view SEG-Y, sesmic, view, viewer |
Users' rating (33 rating) |
SeiSee Free Download - we do not host any SeiSee torrent files or links of SeiSee on rapidshare.com, depositfiles.com, megaupload.com etc. All SeiSee download links are direct SeiSee download from publisher site or their selected mirrors.
2.22.6 | Apr 17, 2015 | New Release | Some bugs fixed |
2.22.5 | Apr 17, 2015 | New Release | Some bugs fixed |
2.22.2 | Nov 7, 2013 | New Release | Some bugs fixed |