Audacity for Mac OS X 3.5.0 freeware

Audacity for Mac OS X is free software, developed by a group of volunteers and distributed under the GNU General Public License (GPL). Audacity supports uncompressed audio standards such as WAV and AIFF in addition to OGG and MP3 files. A full complement of basic effects such as reverb, delay, and compression are included. Virtual Studio Technology (VST), Linux Audio Developers Simple Plugin Architecture (LAPSDA). ...

Author Audacity
Released 2024-04-22
Filesize 23.60 MB
Downloads 5246
OS Mac OS X
Installation Instal And Uninstall
Keywords play sound, recorder, editor
Users' rating
(102 rating)
Audacity for Mac OS XAudio File RecordersMac OS X
Audacity for Mac OS X - change order Freeware Download Notice

Audacity for Mac OS X Free Download - we do not host any Audacity for Mac OS X torrent files or links of Audacity for Mac OS X on rapidshare.com, depositfiles.com, megaupload.com etc. All Audacity for Mac OS X download links are direct Audacity for Mac OS X download from publisher site or their selected mirrors.

Audacity for Mac OS X freeware - The Latest User Reviews

Audacity for Mac OS X 2.0.5
Kevin

(Dec 16, 2013)

I have used this on a Mac mini G4. The program ran well and the features for editing were easy to use. I never lost any files, although the were backed up before starting the editing process. I did make some mistakes editing and it was easier to just start over from the backup file in some cases. Removing clicks and pops from LP's can be a little tedious if the recording has more than a few of them. It is a good idea to read the software manual and/or print some of the pages on editing. I plan to load this program on a new Mac Mini since it worked well with the older model.

Audacity for Mac OS X 1.3.12
disappointed

(Feb 17, 2011)

After several weeks of using it, it has lost a number of my nearly completed projects. There are bugs. It crashes. It loses your files. I lost a lot of time and work thanks to how unreliable this software has turned out to be.

Audacity for Mac OS X 1.2.5
Chris

(Dec 31, 2010)

SUCKS.... Has a seperate download just to save MP3's. Selecting seperate tracks is either impossible or so incredibly conveluted it seems impossible. Has lots of pretty buttons that don't seem to work. A huge waste of time.

View all Audacity for Mac OS X reviews

Audacity for Mac OS X freeware - The Latest Versions History
3.5.0 Apr 22, 2024 New Release
3.4.2 Nov 23, 2023 New Release This is a hotfix release. It fixes the following issues:

#5568 Fix a crash when opening projects with zero-length clips.
#5032 When exporting a file, the sample rate of the tracks is now considered, and last-used sample rate is remembered.
#5555 Copy-pasting now pastes into audio again by default. This can be changed via Preferences -> Track Behavior -> Always paste audio as new clips.
#5549 Mix and render now also resets the gain for the resulting track.
#5571 Fix clips shifting to the right when effects are applied to them.
#5106 Fix clicks occurring when overdubbing a project with muted tracks.
#5533 Fix files being exported without a file extension in rare cases.
#5539 Show all sample rates possible for MP2 exports.
#5518 Fix pasting into labels.
#5543 Fix a crash when clearing loops.
#5529 Fix copying when "select all audio if selection required" is enabled.
#5598 #5552 Fix GTK detection and compilation for wxWidgets 3.2.4.
#5551 Fix Nyquist-related crashes.
3.5.0 Apr 22, 2024 New Release

Most popular Audio File Recorders freeware downloads

Audacity for Mac OS X

3.5.0 freeware download

... Cut, copy, splice or mix sounds together. * Change the speed or pitch of a recording. ... "Libsndfile says" error or corrupted output due to order of metadata in imported files. * (Mac) Fixed ...

Audacity for Linux

3.5.0 freeware download

... Cut, copy, splice or mix sounds together. * Change the speed or pitch of a recording. ... "Libsndfile says" error or corrupted output due to order of metadata in imported files. * (Mac) Fixed ...

Audacity for Windows

3.5.0 freeware download

... Cut, copy, splice or mix sounds together. * Change the speed or pitch of a recording. ... "Libsndfile says" error or corrupted output due to order of metadata in imported files. * (Mac) Fixed ...

MP3Gain (Stable)

1.2.5 freeware download

... your volume knob every time your mp3 player changes to a new song? MP3Gain analyzes and ... actually sounds to the human ear. Also, the changes MP3Gain makes are completely lossless. There is no ...

Free AthTek Voice Recorder

1.99 freeware download

... or playlist will be repeated flexibly as your order. And you are able to control the speed ... Enable to customize hot keys. * Enable to change skins. * Clear interface, easy to handle. * ...