deltasql for Linux 1.7.3 freeware

... an Apache server connected to a database, in order to gather the scripts altering the data model, along with method of handling its branches. ...

Author Renzo, dangermouse, stuckas
Released 2015-12-01
Filesize 9.70 MB
Downloads 1412
OS Linux
Installation Instal And Uninstall
Keywords database management, schema, manage database, version control, SQL database, management, manage, manager
Users' rating
(36 rating)
deltasql for LinuxOther Server ApplicationsLinux
deltasql for Linux - change order Freeware Download Notice

deltasql for Linux Free Download - we do not host any deltasql for Linux torrent files or links of deltasql for Linux on rapidshare.com, depositfiles.com, megaupload.com etc. All deltasql for Linux download links are direct deltasql for Linux download from publisher site or their selected mirrors.

deltasql for Linux freeware - The Latest User Reviews
deltasql for Linux freeware - The Latest Versions History
1.7.3 Dec 1, 2015 New Release This is a maintenance release with following patches and features
New features:
Visibility for projects: useful in large deltasql installations with many users and old unused projects
1.7.2 Nov 13, 2015 New Release This is a maintenance release with following patches and features - Visibility for modules: useful in large deltasql installations with many users and old unused projects - Disabling automatic comments on generated synchronization script at project level: useful when deltasql is used in conjunction with other synchronization tools (e.g. like Microsoft SQL Schema compare) - Other minor fixes in tool, GUI, documentation and XML-Export.
1.7.1 Jul 3, 2015 New Release verification script for Microsoft SQL server did not work properly
ability to search among projects
ability to rename a project

Most popular Other Server Applications freeware downloads

deltasql for Linux

1.7.3 freeware download

... developers with the means of keep tracking of changes performed by team members, acting as a version ... developing middle size or big applications, developers undertake changes to the data model which go along with ...

EncFS MP

0.99.1 freeware download

... to remember. Moreover, you need administrative rights in order to mount the folder, which might require that ... and OS X Can create, edit, export and change the password of EncFS folders Is 100% compatible ...